Eagle Waste Transfer Site, Tipton, West Midlands
Waste Transfer Station | Welfare Facility | Weighbridge | Sub Station
Weighbridge
The weighbridge was logistically very hard to complete due to the nature of its design and central location to the site. All steelwork again galvanized was erected and Kingspan composite cladding completed in a very confined area. Again the same cladding system was used to compliment the main building.