Kings School, Wolverhampton.

K&M were awarded the contract of fabricating the steel frame for this highly technical and detailed structure. Although the demands on precision and accuracy were high and fabrication time was very short, Erection of the frame was expected to take up to three days. Due to the accuracy and high quality finish of the final product, it was completed, with site erection time and costs being reduced to one day.

 