Montgomery Spring Water, Churchstoke, Powys.

This highly respected and well established client, due to an expanding portfolio was looking to expand its current operations. K&M were awarded the design and build contract to supply an new 1500m² additional bottling plant along with a 1000m² new loading facility, which was accompanied by in the installation of new storage tanks and control building. The infrastructure works was phased to work with the clients requirements, which involved the continual operation of their existing works.