Montgomery Spring Water, Churchstoke, Powys.

In line with a highly respected client's ongoing company development, K&M were awarded the design and build contract to supply the initial placement of two new dock shelters and associated access roads, along with redevelopment of the existing loading facilities. While simple in its conception, the logistics of working within the confines of a tight design criteria along with a challenging site environment, with the constant demands of maintaining the clients own daily delivery programme, meant K&M had to flexible in its approach to the project overall. This at times gave the client the ability to manipulate the design to suit there ever changing needs, which K&M were happy to accommodate. Handover was completed in late autumn allowing the client to maintain its own desired work schedule.