Pathway Intermediates, Shrewsbury.

The full D&B for this scheme was a series of support floors spread over 4 levels to hold specifically design equipment for this ever expanding local company. The structure was design to be installed within an existing building and placed upon new pad foundations. The full installation included floor plates to all levels along with a full access staircase. Handover was completed on time with a very good standard of installation by our team.  

 