Built Off Site

60 YEARS

1964-2024

Built Off Site

The design and build of this contract was based around the design criteria of the clients production requirements. Producing modular buildings, the clients design had to take into account the requirements of maximizing space while keeping the budget to a minimum. The clear span 35m long by 25m wide insulated building now gives this client an efficient and dynamic working space to develop its brand further.

Project Gallery

Get in Touch

K&M Engineering (Shropshire) Limited
Sarn Works
Halfway House
Shrewsbury
Shropshire
SY5 9DA

01743 884 340

© 2024 K&M Engineering (Shropshire) Limited - All Rights Reserved