Eagle Waste Transfer Site, Tipton, West Midlands
60 YEARS
1964-2024
Eagle Waste Transfer Site, Tipton, West Midlands
The construction of the new transfer station, at just over 4000 m² & in excess of 200t of galvanized structural steel, with Kingspan microrib composite panel cladding, took just over 3 months to complete and is the main focus of this new facility for Sandwell Borough Council. Although the scheme was main contractor design, our knowledge and expertise assisted the design information to supply the client with a purpose built facility.
Project Gallery
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1448.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/Waste-Transfer-Station-Tipton.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1890.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1862.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1815.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1813.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1779.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1760.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1693.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1634.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1556.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1556.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1551.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1467.jpg)
![](https://www.kandmengineering.co.uk/wp-content/uploads/2024/05/IMGP1448.jpg)
Get in Touch
K&M Engineering (Shropshire) Limited
Sarn Works
Halfway House
Shrewsbury
Shropshire
SY5 9DA
01743 884 340
© 2024 K&M Engineering (Shropshire) Limited - All Rights Reserved