Kings School, Wolverhampton

60 YEARS

1964-2024

Kings School, Wolverhampton

K&M were awarded the contract of fabricating the steel frame for this highly technical and detailed structure. Although the demands on precision and accuracy were high and fabrication time was very short, Erection of the frame was expected to take up to three days. Due to the accuracy and high quality finish of the final product, it was completed, with site erection time and costs being reduced to one day.

Project Gallery

Get in Touch

K&M Engineering (Shropshire) Limited
Sarn Works
Halfway House
Shrewsbury
Shropshire
SY5 9DA

01743 884 340

© 2024 K&M Engineering (Shropshire) Limited - All Rights Reserved