Print this page

SWG Construction - Abermule Business Park.

A client design and build project, for Powys County Council, where the new business park had a requirement for 9no new start up units for local businesses, spaced between two individual units. The 80t of structural steel and 16t of cold rolled material, along with composite panels roofing and horizontally laid external cladding. All internal fitting out was completed by the main contractor with the units passing their air test with ease. The finish to the units were exceptional ready for their new occupants.

 



K&M Engineering (Shropshire) Limited
Sarn Works
Halfway House
Shrewsbury
Shropshire
SY5 9DA
01743 884 340
01743 884 666






Website by shropshiremedia.digital